Today  Time

 

POWER PLANTS OF BILGIN ENERGY > Hazar I-II HEPP

 
 
Hydropower Plant HAZAR I HAZAR II
Location Elazığ / Turkey Elazığ / Turkey
Plant Type: Hydropower Plant Hydropower Plant
Turbine Model Pelton 4 x 3,2MW + 1x 7MW Francis 2 x 5MW
Gross Head 280m 74m
Installed Capacity 19,8 MW 10 MW
Min. Annual Generation 50 Million kWh 10 Million kWh
Date taken under operation December 1996 December 1996

 
     
  Bilgin Enerji Yatırım Holding A.Ş. © 2006

Tasarım Aslihan.Net