Seyrantepe Dam and HEPP |
| Location |
On Peri River / Karakoçan / Elazığ / Turkey |
| Plant Type |
Hydropower Plant |
| Turbine Model |
2 x 24,85MW Francis / Alstom |
| Gross Head |
36m |
| Installed Capacity |
49,7 MW |
| Annual Generation |
161 Million kWh |
| Date taken under operation |
September 2008 |
|
|
|
|
|
|