Aliağa Wind Energy Power Plant

Aliağa WEPP is located in İzmir, Aliağa and Bergama towns around Atçılar village. It consists of 46 wind energy turbines erected on the parallel hills laying on Northwest-Southeast axis. Aliağa WEPP is under operation since April 2010. The project is realized after the evaluation of the wind measurements, which has started in 1999. Aliağa WEPP has an annual electricity production of 441.500.000 kWh and will be reducing 262.180,36 tonnes of carbon emission. 

  • Installed Capacity
  • 120 MW
  • Location
  • Aliağa - Bergama / İzmir
  • Type
  • Wind Energy Power Plant
  • Annual Production
  • 441.500.000 kWh
  • Turbine Used
  • 36xNordex N90 + 10xNordex N117
  • Number of Turbines
  • 46
  • Installed Capacity
  • 2,5 MW (N90) + 3MW (N117)
  • Rotor Diameter
  • 80 m (N90) , 91 m (N117)
  • Rotor Diameter
  • 90 m (N90) , 117 m (N117)
  • Date of Operation
  • April 2010
  • Annual Carbon Emission Reduction
  • 262,180.36 ton