Tatar Dam and Hydroelectric Power Plant

Tatar Dam and HEPP is planned with an installed capacity of 128 MW and the foundation was laid in March 2008.This Project is under operation since November 2013. The power plant is located on the Peri Stream, which is the border for Elazığ and Tunceli provinces and a major branch of Fırat River, and will have an annual electricity generation of 420.000.000 kWh. 

The Dam is 74 meters high form the river bed and has a body made of clay centered sand-gravels.

  • Installed Capacity
  • 128 MW
  • Location
  • Peri Stream / Elazığ
  • Type
  • Hydroelectric Power Plant
  • Annual Production
  • 420.000.000 kWh
  • Turbine Used
  • Andritz Hydro
  • Number of Turbines
  • 2
  • Installed Capacity
  • 64 MW
  • Rotor Diameter
  • 70 m
  • Rotor Diameter
  • 74 m
  • Date of Operation
  • November 2013

Pembelik Dam and Hydroelectric Power Plant

The project is developed and realized with an installed capacity of 128 MW and the construction phase has started. The project is under operation since March 2015. The power plant is located on the Peri Stream, which is the border for Elazığ and Tunceli provinces and a major branch of Fırat River, and will have an annual electricity generation of 420.000.000 kWh. 

The Dam is 81 meters high form the river bed and has a body made of hardfill.

  • Installed Capacity
  • 128 MW
  • Location
  • Peri River / Elazığ
  • Type
  • Hydroelectric Power Plant
  • Annual Production
  • 420.000.000 kWh
  • Turbine Used
  • Andritz Hydro
  • Number of Turbines
  • 2
  • Installed Capacity
  • 64 MW
  • Hub Height
  • 77 m
  • Height of the Dam
  • 81 m
  • Date of Operation
  • March 2015