Seyrantepe Dam and Hydroelectric Power Plant

The project is developed and realized by with an installed capacity of 58.78 MWm/56.84MWe and is under operation since September 2008.

The power plant is located on the Peri River, which is the border for Elazığ and Tunceli provinces and a major branch of Fırat River. Seyrantepe HEPP has an annual electricity generation of 165.000.000 kWh. 

The Dam is 36 meters high form the river bed and has a body made of clay centered sand-gravels.

  • Installed Capacity
  • 56 MW
  • Location
  • Karakoçan /Elazığ
  • Type
  • Hydroelectric Power Plant
  • Annual Production
  • 165.000.000 kWh
  • Turbine Used
  • Alstom / Vertical Axis - Francis
  • Number of Turbines
  • 2
  • Installed Capacity
  • 28 MW
  • Hub Height
  • 36 m
  • Date of Operation
  • September 2008